Al-Humaimah water treatment plant
Electrical and control panels for Al-Humaimah water treatment plant (2018) and the upgrade of the existing plant with Setra and Veolia (2019).
End userNational Water Company; Ministry of Environment, Water and Agriculture
Main contractorSetra; Setra / Veolia
SectorWater and wastewater
Year2018–2019

Scope of supply
Two phases: the 2018 plant package for the National Water Company, and the 2019 upgrade of the existing plant.
Equipment supplied
- Motor control and control panels
Factory testing
Horizons verifies assemblies to IEC 61439 before dispatch: incoming inspection, routine verification, functional tests and FAT witnessed on request. Project-specific test records are available to the client.